INTRODUCTION 

The Cape Fear Center for Inquiry is a charter school in Wilmington, North Carolina. The school is K-8 and has a student population of 320. The school has 71.4 % proficiency scores in the 8th grade computer skills competency test and this shows a need for improvement in order to reach the state average of 80 %.  A teacher and Board member of the school conducted a survey to gather information about the teacher’s feelings and attitudes toward the school’s technology situation and performance.  Based on the surveys and observations the teachers have a desire to learn more computer skills and are not comfortable using the existing hardware and software within the school.  

The Cape Fear Center for Inquiry is a charter school in Wilmington, North Carolina that focuses on small classroom settings and inquiry based learning.  Inquiry Based Learning is “an educational activity in which students individually or collectively investigate a set of phenomena-virtual or real-and draw conclusions about it” (Kuhn, 2000)

  Inquiry is:

 Charter schools are public schools.  Like other public schools they are required to establish and follow a technology plan for the state of North Carolina.  The Cape Fear Center for Inquiry is a public charter school.  CFCI essentially operates as its own district or Local Education Agency.  Cape Fear Center for Inquiry has chosen to adopt the North Carolina Standard Course of Study as its curriculum framework.  It is therefore required to teach the Computer Technology Skills as listed in the SCOS.  

The technology plan requires that the teachers provide more hands-on technology within the inquiry-based classroom lessons.  Improvements are needed in the school’s technology infrastructure, personnel support, and technology skills for teachers.  Another primary goal is to increase proficiency in the state mandated testing for 8th graders in Computer Competency Skills.  

The technology plan consists of a mission and vision established by CFCI.  Beginning the project, Phase I, a major component will be the infrastructure changes and additions to the school concerning technology hardware, software, and the addition of support personnel.  The technology infrastructure needs hardware and software additions and upgrades.  A computer network and lab must be added and the existing computers and mobile labs need maintenance and upgrades. Technology support personnel will provide support for all staff members.  

In Phase II, professional development will influence the plans for school curriculum and instruction.    These personnel will establish the changes in the infrastructure and provide additional instructional support as needed.  The teachers will receive assistance to improve technology skills through a professional development plan.  The professional development will provide training for basic computer skills as well as technology integration strategies.  The professional development plan also incorporates reflection and evaluation to establish continuous improvements.  These improvements will benefit the overall quality of technology integration in each classroom. 

The final phase will include students and their innovations and projects that integrate technology.  Phase III engages the students with the integration of technology.  All grade levels will be able to demonstrate their improvements in computer skills.  This entire plan will be implemented over the course of three school years.

BACK TO TOP

MISSIONSTATEMENT 

The Cape Fear Centerfor Inquiry’s mission is to promote students’ abilities to think and create in personally meaningful ways through an inquiry-based, integrated curriculum in a nurturing environment.  

 VISION

This technology plan and vision is to provide the necessary tools for the community, staff, and students to achieve the school mission.  CFCI will integrate technology in a seamless manner into the inquiry based curriculum using a variety of applications and resources.   

    Goals (Outcomes)

    Indicators

    Benchmarks

    Measures

     

     

     

     

    PHASE 1: Infrastructure

     

     

     

    1.1 A full-time technology integration specialist will be available to support the technology implementation plan 

    1.2 A part-time contracted information technology specialist will be available to support the implementation plan

    A hired technology integration specialist is working full time at the school 

    A part-time information technology specialist is fulfilling contractual agreement

    By August 1st, 2005 before year one begins, a technology integration specialist will be hired. 

    By August 1st, 2005 before year on begins, an information technology specialist will be available to support the implementation plan. 

    Technology integration specialist hired 

    Monthly reports will be prepared by the Technology Specialist and contain details of major tasks accomplished. These tasks will be reviewed by the director of CFCI as part of the end of the evaluation of the new employee.

    1.3 Existing laptops will be upgraded with new software 

    Additional educational software is installed on the laptops.

    By June 1st 2006, the laptops will new have educational software installed.  

    By October 31st 2005, the Technology Specialist/Instructional Technologist will apply for grant funds. 

    Laptop software inventory will be compared to the beginning of year one.

    1.4 Create computer lab within school available for all classes

    25 computers, tables, and printer are in the computer lab. 

    Room is converted to a computer lab

    By June 1st 2006, there will be a networked computer lab. 

    By October 31st 2005, The Technology Specialist/Instructional Technologist will apply and receive grant funds

    A computer lab exists within the school

    A computer lab schedule will be set to allow time for each grade level to visit the lab for special projects and activities.

    1.5 Teachers will have 1 new desktop per classroom with printer.  

    A computer, table, and printer are in each classroom.

     

    By June 1st 2006, all classrooms will be equipped with a working desktop computer that is fully networked.   

    By June 13th 2006, there will be a working printer in every classroom. 

    Classroom computer inventory will be compared to the beginning of year one.

     

     

     

     

     

    PHASE 2: Professional Development 

     

     

     

    2.1 Teachers will become more computer literate 

    Teachers will:

    Produce inquiry-based lesson plans that integrate technology  

    Use multimedia to create presentations to use in classroom instruction 

    Use telecommunication to email, create web sites, and find resources for lessons. 

    Create lesson plans that teach ethical standards 

    By June 1st 2007, 95% of teachers will have attended 10 hours or more of hands-on technology workshops on integration. 

    By June 1st 2007, all classroom teachers will be able to send and receive email. 

    By June 1st 2007, all teachers will know how to create a web site.

    Qualitative and quantitative analysis of teachers’ products and classroom activities  

    Teacher technology survey 

    Teacher computer competency test scores 

    Workshop exit surveys and semester follow-up surveys

     

     

     

    PHASE 3:  Curriculum and Instruction 

     

     

     

    3.1 Teachers will create lessons that include technology integrated into inquiry-based lessons.

    Teachers will:

    Use laptop carts and desktop computer lab for instruction 

    Use technology integrated lesson plan within lessons

    By June 1st 2007, teachers will teach at least one integrated technology lesson per week

    Completion of integrated lesson

    3.2 Teachers will reflect and evaluate their lessons to establish continuous improvements

    Teachers will:

    Complete a reflection form once for every unit that integrates technology. 

    Meet with colleagues to share and discuss areas for improvement and successes. 

    Report, once per semester, all plans for continuous improvement to administrators and board members. 

    On-Going 

    By December 1st 2006, each grade level will submit the first continuous improvement plan to the board of directors.   

    By June 1st 2007, each grade level will submit the second continuous improvement plan to the board of director.            

    Semester completion of Continuous Improvement Plans 

    Minutes from Continuous Improvement Meetings

    3.3 Students will use technology to develop products for assignments

     

    Students will:

    Produce documents using desktop publishing software 

    Organize and store data using database software 

    Use spreadsheets to calculate information

    Use multimedia to create presentations

    Use telecommunications to complete research for projects 

    Demonstrate knowledge of ethical standards

    By June 1st 2008, 50% of students will complete products utilizing technology skills 

     

    Qualitative and quantitative analysis of students’ products and classroom activities 

    Student technology surveys

     

    3.4 Student performance on the computer skills multiple choice and performance test will improve 

    Students will:

    Engage in inquiry based activities using computer skills

    By June 1st 2008, the proficiency scores will be raised to 80% proficiency.

    Computer Skills Test scores

    3.5 Students will display products in school-wide Technology Fair

    Students will:

    Develop and present technology based projects for the Technology Fair

    Invite parents and members of the community to view projects

    By June 1st 2008, the community will attend a CFCI Technology Fair

    Technology Fair Event

    Video footage and photos will be taken at the event.

    3.6 Evaluation of the three-year plan will take place that should identify areas that work well and areas that need improvement in order to continue the technology integration.

    The contracted evaluation team will:

    Conduct summative evaluations to determine areas that need improvement.

     

    By June 1, 2008, an evaluation team will be contracted to conduct the summative evaluation. 

    By June 15, 2008, the team will present results of the evaluation to the Planning/Advisory committee.

    Evaluation results

    Hardware

    Location and Quantity

    Technical Requirements

    Timeline 

    Desktop Computers

    Computer Lab (25)

     

    Classroom (2 per room)

     

     

    Windows XP Professional

    Microsoft Office XP 

    Microsoft Works 8.0

    Norton Internet Security

    Intel Processor 3.0E GHz

    512 Megabytes RAM

    40-Gigabyte Hard Drive

    1.44MB Floppy drive

    DVD/CDRW Combo Drive

    Integrated 56K Modem + 10/100 Ethernet LAN

    3-year warranty

     

    Phase 1

    By June 1, 2006

     

    Laptop Computers

    Main Offices

     

    Departmental Offices

     

    Technology Support Offices 

     

     

    Windows XP Professional

    Microsoft Office XP 

    Microsoft Works 8.0

    Norton Internet Security

    AMD Sempron 3000+ (1.8GHz)

    512 Megabytes RAM

    40-Gigabyte Hard Drive

    1.44MB Floppy drive

    DVD/CDRW Combo Drive

    3-year warranty

    54g(TM) Integ. Broadcom   802.11b/g WLAN & Bluetooth

    Integrated 56K Modem + 10/100 Ethernet LAN

     

    Phase 1

    By June 1, 2006

     

    Color Deskjet Printers

    Classroom (2 per room)

    Color and Black Print Capabilities

    USB 2.0

    Up to 4800 x 1200 dpi

    16 MB/16 MB

     

    Phase 1

    By June 1, 2006

    Laser Printers

    Computer Lab (1)

     

    Main Office (1)

     

    Faculty Workroom (1)

     

    Network Ready 

    1200 x 1200 dpi 

    48 MB 

     

    Phase 1

    By June 1, 2006

    Flatbed scanner

     

    Computer Lab (1)

    Up to 2400 dpi 

    48-bit color 

     

    Phase 1

    By June 1, 2006

     

    Data projector

    Computer Lab (1)

     

    Available for Checkout to classrooms (3)

     

    1 1,500 lumens 

      800 x 600 True SVGA resolution 

     

    Phase 1

    By June 1, 2006

     

    Goals and Benchmarks

    Description of Strategies/Activities to Achieve Goals and Benchmarks

    Timeline (Projected date for Achievement)

    Budget

    Technology Integration Specialist (TIS)

     

     

     

    Support students in using technology to develop products for assignments

    Benchmark

    ·         By the end of Phase 1, Technology assistance forms, policies and procedures will be developed 

    ·         By the end of Phase 2, a visitation schedule will be implemented.

    ·         By the end of Phase 3, 100% of student technology assistance requests are responded to.

     

    Develop and follow a class visitation schedule to assist in planning and implementing support for students in development of products or assignments

     

    Develop a technology assistance request form for teachers to use to formally request help.

     

    Distribute and explain network and computer use policies and procedures for technology assistance request forms.

     

    Phase 1: August 2005 to May 2006

     

    Phase 2: August 2006 to May 2007

     

    Phase 3: August 2007 to May 2008

    Salary $35,000

     

    Support teachers in implementing strategies to improve computer competency test scores

    Benchmark

    ·         Technology hardware and software needs will be met by the end of Phase 1, August 2005 to May 2006

    ·         Computer lab schedule will be available by the end Phase 1:  August 2005 to May 2006

    ·         Technology training sessions will be held by the end of Phase 2, August 2006 to May 2007

    ·         Technology support offered in classrooms for special projects by the end of Phase 3, August 2007 to May 2008

     

    Develop classroom lessons to work on computer skills

     

    Team teach computer skills lesson plans

     

    Provide lab time for all teachers

     

    Conduct staff development that focus on computer competencies

     

    Phase 1: August 2005 to May 2006

     

    Phase 2: August 2006 to May 2007

     

    Phase 3: August 2007 to May 2008

    Information Technology Specialist (ITS)

     

     

     

    Teachers and students will have uniform and up-to-date technology within the facility 

    Benchmark

    ·         Hardware and software needs will be met by the end of Phase 1, August 2005 to May 2006

    ·         Routine maintenance will be performed on a regular schedule to be determined by the specialist.  Schedule will be ongoing in the beginning of Phase 2: August 2006 to May 2007

     

    Routine maintenance and software installation will be performed by the technology assistant 

     

    Phase 1: August 2005 to May 2006

    Phase 2: August 2006 to May 2007

    Phase 3: August 2007 to May 2008

     

    Salary $25,000

    The Technology Committee (TC)

     

     

     

    Committee will participate in the planning and implementation of the technology plan.

    Benchmark

    ·         Committee will help select new technology employees during the summer of 2005 before Phase 1 begins.

    ·         Committee will provide input for staff development based on teachers’ training needs during Phase 1, beginning in December 2005. 

    ·         Committee will assist in organization of all training during Phase 1, August 2005 to May 2006 for Phase 2 August 2006 to May 2007

     

     

    Conduct survey to find out teachers’ training needs

     

    Committee meetings conducted monthly to discuss training needs.

     

    Committee provides trainers with print materials needed for training

     

    Committee is responsible for informing all teachers of training dates and sending out reminders

     

    Committee is responsible for providing all refreshments and facilities for training 

    Phase 1: August 2005 to May 2006

    Phase 2: August 2006 to May 2007

    Phase 3: August 2007 to May 2008

     

    Stipend per person

    $300

     

    Board of Directors

    The board of directors will provide organizational support in the planning and implementation of the technology plan

    Benchmark

    • The board will approve the technology plan during the summer of 2005 before Phase 1 begins.
    • Provide support for professional development plan during Phase 2.

     

    Committee meetings conducted monthly to discuss training needs.

     

    Monitor progress of faculty attendance and completion of professional development sessions.

     

    Provide requested funds for projects.

     

     

     

    Phase 1: August 2005 to May 2006

    Phase 2: August 2006 to May 2007

    Phase 3: August 2007 to May 2008